The Panama Canal Authority is increasing the number of shipping segments from eight to ten that will have to pay the increased tolls from eight to ten.

The containerised and breakbulk shipping sectors were to have been included in the ACP’s original toll hike proposal that was subsequently postponed until October 2012 and October 2013, respectively, but were spared from the higher charges for the time being.

From Heavy Lift